|
This project proposed to locate a biomass (willow coppice) power station on the redevelopment site of the former colliery at Grimethorpe. 2B was appointed as landscape consultant, but it soon became clear that our graphical skills would be of great assistance on the project. 2B produced a coordinated exhibition with content provided by a team of consultants. The exhibition was taken to various locations around Grimethorpe to explain the proposals. Photomontages were produced, based on the architect's design, providing a series of views from key locations around the proposed site. As well as being responsible for the landscape and visual assessment, 2B coordinated the production and printing of the statement itself, creating a stylistically coordinated document rather than a set of individual documents. 2B specified page layout and graphic design, received text and graphics from the team of 10 consultants, compiled the ES (with electronic drafts at relevant stages to the client) and organised the printing of the ES to the client's satisfaction. The client enjoyed our friendly, can-do attitude, and wrote: Dear Liz and Bill Potential Power Station at Grimethorpe I am most grateful for all your involvement in the whole process of this series of public exhibitions, followed by the very drawn out work for the Environmental Statement. The presentation itself is excellent and I really feel that we have put forward our best foot. You showed great (joint and several) patience with a client that came to hinder all your carefully laid plans. You entertained him to lunch on several occasions and allowed him totally to disrupt your professional and domestic arrangements. Always the job was done with good humour. Decisions requested were packaged with alternatives and advice. Information was supplied by return. Excellent service. I would be delighted at any time to supply a reference, should that be necessary. With renewed thanks and best wishes, Yours sincerely Hugh Moss |
|